138 Robert Street East
Application Status: A public meeting was held on April 13, 2023. The application is currently under review.
Notice of Complete Application and Public Metting
Description of Application:
Official Plan Amendment: The purpose of the amendment is to redesignate a portion of the subject lands, located north of the Gauthier Drive extension and west of the proposed ‘Street A’, from ‘Employment Area’ to ‘Neighbourhood Area’. The OPA further seeks the implementation of a Defined Policy Area to align the Town of Penetanguishene Official Plan with the Growth Plan for the Greater Golden Horseshoe, facilitating the conversion of these Employment Lands.
Draft Plan of Subdivision: The proposal is to develop the lands into 283 lots for Single Detached Dwellings, Blocks for Townhouses having 281 units for a total unit count of 564, and 11 blocks for employment land uses. Additionally, one (1) block for a park, and two stormwater management ponds, together with roads, road widenings and daylight triangles to be dedicated to the Town.
Zoning By-law Amendment: The subject site is designated Neighbourhood Area and Employment Area under the Town’s Official Plan. The property is zoned Rural “RU” Zone and Deferred Development “D” Zone. The requested rezoning proposes: five (5) new site-specific residential zones that have reduced requirements for Lot Frontage, Lot Area, Front, Rear and Side Yard setbacks and increased Lot Coverage for the Main Building and Accessory Buildings. The application also proposes one (1) new site-specific industrial zone that provides for reduced permitted uses, as well as Open Space zones.
Supporting Materials:
- Draft Plan of Subdivision
- Environmental Site Assessment (ESA) prepared by BAE Environmental dated June 10, 2022
- Stage 1 and 2 Archaeological Study, prepared by ASI Heritage dated August 9, 2022
- Arborist Report prepared by Burgess Gleason dated August 9, 2022
- Geotechnical Report prepared by Cambiuim Inc. dated August 17, 2022
- Hydrogeology Report prepared by Cambium Engineering dated September 19, 2022 (available upon request)
- Land Use Compatibility Report (LUCA) prepared by Sonair Environmental dated September 19, 2022
- Air and Noise Study, prepared by Sonair Environmental dated September 20, 2022
- Environmental Impact Study (EIS) prepared by Cambium Inc. dated September 23, 2022
- Functional Servicing Report (FSR) and Stormwater Management Report (SWM) prepared by Gerrits Engineering dated September 29, 2022
- Traffic Impact Study (TIS) prepared by GHD dated December 21, 2022
- Planning Justification Report (PJR) prepared by IPS Planning Consultants dated December 2022
- Concept Plan Block 306
- Concept Plan Block 309
- Topographic Survey